February 2000

Gearing at the end of a generator near the main refrigerator compartments


The operating ranges for an engine

Cut ends of some of the many, many wires which had to be removed from the Yukon



In the shell magazine


This maybe gives you a better sense of perspective…



In the floor near the hatchway down to the shell magazine


Cleaning Stations—Mess Decks




Looking down into the boiler room

In the engine room

An air conditioning unit

These kinds of signs are everywhere… what does it mean? (see chart above)

3″/50 Mounting & Gunar Power Panel brass plaque

One of many murals painted on the Yukon by the Sea Camp kids





That’s the Coronado Bay Bridge in the background


Looking out the stern

The pink marks “head bangers” which will be removed

Pumping out a hold


Propeller shafts—approximately 100 feet long and maybe 12 inches in diameter

This time lit with a dive light and hand-held on a long exposure

Engine Room




On her stern; the box says “Headset Storage Box”



A pile of removed hatch covers

In the engine room—detail shot below of the measuring device

Note the marked inches on the ruler and the clear glass tube next to it


Same shot, different lighting

Close-up of the gear pictured above

Still in the engine room, looking up at the ceiling


Still in the engine room




Giant gears


Control panel in the engine room

Note the manifold on the left side—hundreds of tiny pipe openings

The clean up continues

The print says “Test Pressure 3000 PSI”

More of the murals…










More of the murals…





Working on the forward gunmount


This paint mark—on the floor—was made by putting paint on a dead squid…


This red button is the actual button which was to be used to set off the final charges and sink the Yukon.




The work continues…
